产品
下载
联系我们
网站地图
返回首页

微信扫一扫
在线技术支持

微信扫一扫
访问视频号

Otasuke FAQ's Book
 FAQ
 Wish to confirm the current value of the variables.

In Pro-Control Editor, select [Data] in the menu bar -> [Data Watch List]. You can confirm the current value of the variables in this list.

- GP-PRO/PB3 C-Package03
  1. In Pro-Control Editor, select [Data] in the menu bar -> [Data Watch List].
   
     
  2.

Data Watch List appears, and then you can check the current value of the variables by dragging and dropping the variable from the Logic Program to the Data Watch List window.
Also, you can change the current value by double-clicking the variable of Data Watch List.

   
     
- LT Editor
  1. In Logic Program Editor, select [Data] in the menu bar -> [Data Watch List].
   
     
  2.

Data Watch List appears, and then you can check the current value of the variables by dragging and dropping the variable from the Logic Program to the Data Watch List window.

   
Return to Top Close
常见问题 | 个人信息保护 | 关于知识产权 | 使用条款
版权 (C) 2005- Schneider Electric Japan Holdings Ltd.,和普洛菲斯国际贸易(上海)有限公司版权所有,保留所有权利。
沪ICP备05028659号-3